Project Summary: Tetley Halls is the second phase of a residential development in Headingley, a leafy Leeds suburb, featuring 12no. 1 & 2 bedroom modern open-plan apartments constructed over 4 floors.
Constructed with sustainability being a priority, all units have MVHR fuel efficient units providing fresh filtered air to the building whilst recycling the existing heat output therefore reducing future running costs. External amenities include electric vehicle charging and secure bike storage for residents.
Peak PM have provided monthly attendance on site to undertake a detailed site inspection and preparation of a Quality Statement Report. The report includes programme reviews, summaries of construction activities and a detailed review of workmanship quality. General reviews of M&E installations were undertaken during the inspections, drawing the Contractors attention to defective works that would otherwise go unseen once concealed behind finishes.
The contractor has welcomed Peak PM’s involvement in the project, which has certainly increased the diligence to quality, reducing the quantity of snagging works typical at Practical Completion.